Restoration work at St-James Church in Hudson, Que., is preserving the landmark’s historic features while preparing it for a broader community role, more than two years after a fire destroyed its roof and damaged its interior, CBC reports.
The 184-year-old church is being rebuilt as a multipurpose gathering space, with plans to accommodate secular activities as well as religious gatherings involving different faiths.
“It’s a mammoth project,” volunteer project manager Marcus Owen told CBC’s Chloë Ranaldi.
The April 2024 fire began in an adjoining building and spread through the roof into the church. It burned for several hours, leaving the church’s walls standing but destroying its roof and the building where the blaze originated. Water used to fight the fire also ruined the church’s furniture and subfloor, which had to be replaced.
Restoring the building, which dates to 1842, has involved structural challenges and extensive architectural work to meet current building standards, Owen said. Installing a heating, ventilation and air-conditioning system has added to the complexity and cost.
“It’s an old fieldstone building and there’s always surprises when you’re recovering an aged building like this,” he said.
Preserving the church’s architecture remains a priority. The work includes restoring stained glass windows and having carpenters preserve the original doors. Removing white gypsum board from the interior walls revealed fieldstone that Owen said will become the restored walls’ exposed finish.
The team has also sought to replicate the original roof, using British Columbia fir with a more substantial structure to meet current code requirements.
For Frank Royle, the restoration carries a personal connection. He lived with his family in the neighbouring rectory for 31 years while his father served as rector from 1946 to 1977.
“It was the centre of my universe,” Royle told CBC. After initially finding the fire’s destruction too painful to look at, he now looks forward to the building’s future as a community centre.
Insurance is helping cover some repairs, but Owen said unexpected challenges and mounting costs have increased the project’s price. Organizers expect to pursue fundraising in the coming months to help complete their vision for the building.
Source: CBC reporting by Chloë Ranaldi.




Leave a comment
Join the discussion. Please follow our Community Standards.
Sign in or create an account to leave a comment.
Choose your public display name before submitting. Your email address stays private.
No published comments yet.